Quick Answer

H piles are wide-flange sections driven into the ground to carry foundation loads — HW 250×250 to HW 400×400 (72–134 kg/m) are the workhorse sizes, in Q235B/Q355B or ASTM A572. Pile orders run long lengths with splicing welded on site; driving picks flange steel tough enough to survive hammer impact, and packages ship cut-to-length with 3.1 MTC.

Foundation work consumes H beams in one of their toughest roles: driven as bearing piles. The section takes hammer blows at the top, soil friction along the flanges, and decades of axial load underground. Pile packages have their own logistics — long lengths, site splicing, and steel picked for driving, not just strength.

Which Sections Work as Bearing Piles

SectionWeight (kg/m)Typical Use
HW 250×25072.4Building foundations, light marine
HW 300×30094.5The standard bearing pile for mid-rise and industrial
HW 350×350≈ 128Heavy industrial, bridge abutments
HW 400×400≈ 134–172Deep foundations, port structures
HN 400×200-class≈ 66Retaining walls, king posts

US drawings call them HP sections (HP8–HP14); GB drawings use the HW family — same concept, and Chinese mills roll pile-grade sections to either designation: GB H beam system → · W series chart →

What Driving Demands from the Steel

  • Toughness over hardness: hammer impact at the head needs steel that deforms, not cracks — Q235B/Q355B with clean, sound microstructure (UT on heavier sections).
  • Flange stability: wide flanges resist bending under driving misalignment; narrow sections deform — pile grade flanges run thicker relative to web.
  • Splicing: piles longer than the section run (12 m) splice by full-penetration butt welds on site; supply extra length for the weld prep.
  • Below-grade protection: bare steel works in most soils; aggressive soils (chlorides, industrial) take concrete encasement or coatings — decide before ordering.

How Pile Packages Ship

  1. Cut-to-length per the pile schedule (e.g. 9 m + 6 m segments for 15 m piles, welded on site): cutting service →
  2. 12 m lengths ship in 40GP; longer segments break bulk: logistics guide →
  3. Driving shoes (rock points) fabricated to order where soil demands.
  4. EN 10204 3.1 MTC per heat; SGS/BV inspection at loading for pile packages — inspection checklist →

Pairs with: warehouse framing · crane runways — the full industrial package from one supplier.

Pile schedule in — cut lengths and splices planned