Quick Answer

A ringlock system is five components: rosette standards (48.3×3.2 tube with rosette plates at 500 mm pitch), ledgers (0.6–3.0 m), diagonal braces, base jacks and planks — all hot-dip galvanized Q235/S355JR steel. A 40GP container plans 26–27 t across components in the mixing ratio the fleet needs; MOQ 5 t.

Ringlock (rosette) scaffolding has become the default on large sites — faster to erect than tube-and-clamp, stronger than frame systems, and standardized enough that components from any maker couple together. Scaffold makers and rental fleets buy the components by the container; here is the parts list and the steel behind each.

The Five Components

ComponentSteel BaseSizesFunction
Standard (vertical)48.3×3.2 mm tube, rosettes welded at 500 mm pitch0.5 / 1.0 / 1.5 / 2.0 / 3.0 mThe vertical backbone — rosettes connect up to 4 ledgers + brace per level
Ledger (horizontal)48.3×3.2 mm, wedge heads forged on0.6 / 0.9 / 1.2 / 1.5 / 1.8 / 2.4 / 3.0 mHorizontal working levels
Diagonal brace48.3×2.5 mm, wedge headsmatched to bay × liftLateral stability
Base jackSolid bar Ø38 mm, HDG nut0.6 m adjustableLeveling on grade
Plank / platformSteel plank 320 mm or timberper bay widthWorking surface

The Steel Behind the System

  • Base tube: Q235 / S235JR, 48.3 mm OD — same as scaffold tube: tube specs →
  • Rosettes and wedge heads: forged or stamped from Q345-class plate, welded per the system's jig — the quality of these welds decides fleet life.
  • Finish: hot-dip galvanized after fabrication — rental fleets demand full HDG; see the lifecycle math in galvanized vs black.
  • Loads: ledger capacity 30–45 kN depending on wall and span; system design per EN 12811 or local code.

Container Planning for Scaffold Makers

  1. Typical fleet mix per 40GP: standards 40%, ledgers 30%, braces 15%, jacks and planks 15% — matched to your rental book.
  2. Components nest tightly; rosette standards bundle with padded separators to protect galvanizing.
  3. We supply complete kits or base tube only (you weld the rosettes) — both routes quoted.
  4. MOQ 5 t; system orders usually start at one 40GP (26–27 t).

Cuplock systems run the same steel with cup joints — quoted the same way: scaffold tube specs → · billet supply for your own forging line →

System kit or base tube — quoted the same day

Component list (or your fleet-mix ratio) to [email protected] or WhatsApp +86 191 5745 8011 — HDG ringlock kits quoted FOB/CIF with container plan. MOQ 5 t.

Request Ringlock Quote